Here is a photo of the balcony columns that were installed on Monday, it looks so much better than before!
Still waiting for the site to be cleaned up, the front stairs to be installed and the external painting to happen, but today the inspection by Local Group was carried out, the left hand side retaining wall including stairs was pretty much completed and the painters were back to fix up the stairs.